Siemens completes extensive service in record time at power plant in Dubai

IM2017050621PS 300dpiSiemens has completed extensive service operations on the gas turbines at Jebel Ali K-station in a record time of only 29 working days, a notable accomplishment for a project of this scale

Hits: 1299

Read more ...

New method for timing tests on GIS with grounding on both sides

CIBANO 500Omicron’s circuit breaker test system CIBANO 500 now offers the new Current Sensor Measurement (CSM) method. This allows the operating times of the circuit breaker to be determined accurately despite the fact that the GIS is grounded on both sides 

Hits: 2514

Read more ...

The new ACTAS P260/P360: Switchgear testing at its best!

ACTAS P360 P230KoCoS Messtechnik AG (Germany) and its subsidiaries develop, manufacture and sell measuring and test systems for equipment in electricity supply systems and laser-optical inspection systems for quality monitoring in the semi-conductor, automotive and food industries. 

Hits: 4639

Read more ...

Megger’s three-phase power quality analyser is intuitive and efficient

megger webMegger is now offering a handheld, three-phase power quality analyser that makes power quality analysis easier and more efficient

Hits: 4492

Read more ...

Omicron release solutions for on-line partial discharge monitoring on rotating machines

omicronEarly detection of insulation defects helps prevent machine failure and safeguards investments, and the latest Omicron on-line partial discharge monitoring detects insulation defects early so that corrective action can be taken to prevent failure and to extend the service life of motors and generators

Hits: 4523

Read more ...

Alain Charles Publishing, University House, 11-13 Lower Grosvenor Place, London, SW1W 0EX, UK
T: +44 20 7834 7676, F: +44 20 7973 0076, W: www.alaincharles.com

twn Are you sure that you want to switch to desktop version?