Two SST5-5000 steam turbines are to be installed in the new steam power plant at Attarat Um Ghudran, Jordon. (Image source: Siemens)
Siemens has received an order to supply two SST5-5000 steam turbines, two air-cooled SGen5-1200A generators and the turbine control system to Attarat steam power plant in Jordon, which will be built in the dessert of Attarat Um Ghudran and is expected to become operational in mid-2020