The JAC-Series gas turbines shipped for this project will be installed in a power generation plant being built in a coastal area of Fujairah. (Image source: Adobe Stock)
Mitsubishi Power has shipped a total of three M701JAC gas turbines to the Fujairah F3 power plant in the UAE from its Takasago Machinery Works in Hyogo Prefecture