
The substation will provide Yanbu-4 with the power required by each load centre at the plant. (Image source Adobe Stock)
GE Renewable Energy?s Grid Solutions has won a deal from Doosan Heavy Industries and Construction to build a turnkey substation that will power the Yanbu-4 independent water producer (IWP) plant