hese transformers have a 98.5 per cent working reliability, which translates into minimum power loss during the transformation process and an increase in the power efficiency of the facility.
The HRS 6300 D5/6 and the HRS 3150 D5/6 transformer substations built by HIMOINSA, in a 20 and 10ft container version, respectively, make transformation possible by increasing the voltage of four generator sets connected in parallel in the same station, which make possible to transform 6.3MVA and 3.15MVA depending on whether a 20 or a 10ft container is used