Reliability in service is a big priority: every new FG Wilson design is thoroughly validated at the UK facility including 500 hours of testing at full load power rating, covering maximum cold load step and hot load step. (Image source: FG Wilson)
Paul Creighton, managing director at FG Wilson, gives insights on the evolving nature of the genset business